Go to Administration>Scheduled Services.
Offline mode is only available for Cloud Connect aliases with cache enabled and must be configured in P6 as well as in the P6 Professional Cloud Connect database alias.
Credit to TenSix Copyright © 2021 · Ten Six Consulting, LLC · 703.910.2600
https://help.aconex.com/construction-engineering-primavera-information-hubhttps://help.aconex.com/construction-engineering-primavera-information-hub
Download and Install Primavera Professional
Oracle Primavera Cloud provides the ability to download the Primavera Professional desktop application for a Windows or macOS operating system. The Get Oracle Primavera Professional page contains instructions for selecting your operating system and downloading the application installation file.
When downloading, installing, and using Primavera Professional, consider the following:
To download and install Primavera Professional:
1. Open the Oracle Help Center site for Primavera P6 Professional: https://docs.oracle.com/en/industries/construction-engineering/primavera-p6-professional/index.html
2. Click the Documentation Library link to the release of P6 Professional you are using.
3. In the Table of Contents, click Using
4.
Under the heading “How do I get help for P6
Visualizer?” click the HTML link.
cr
C
You can avoid pre-populating all of the code values and just add them on the fly. First create a Code called End Date in Summary & Settings (as described above). Do not create any code values under End Date (for now). Then add End Date as a column in your Resource List grid. When you go to assign a new end date to a particular resource, you can create a code value on-the-fly at the bottom of the popup dialog. Enter ‘29-Sep-20’ as the value name and ID. See below (I’m using Department as an example code.)
This report consists of a chart and a table. The chart shows Planned Labor Units on the y-axis and date on the x-axis and plots the Original Planned Labor Units, Achieved versus Plan, Additional Work and Milestone Dates. The table gives the Total Target Planned Work, Planned Work To Date, Cancelled Work To Date, Additional Work To Date, Planned Work Achieved To Date, Total Work Achieved To Date, Manhours Planned, Manhours Achieved, Lost Time Manhours To Date, Actual Percent Complete To Date, Target Percent Complete To Date, and Actual Manhours To Date.
Location
Everything you want to know about the C&E product suite.
https://docs.oracle.com/en/industries/construction-engineering/index.html
The Manage Companies table in Primavera Administration enables you to manage companies for your applications. A company represents a logical container of users in Primavera Administration.
There are two types of companies:
When you add a partner company in Primavera Administration, you can also assign one or more applications to the company. If you assign Primavera Unifier, the partner company is also created within that application.
Click the Manage Companies tab to view the Manage Companies table.